Wednesday, January 27, 2010

Wedding Programs Templates In Spanish

BBVA Meeting Cancelled

Cancelled meeting with BBVA. It appears that the data available to the BBVA are not the same that we have signed contracts.


meeting is delayed until clarification.


Still no date. We will keep you informed.

Tuesday, January 26, 2010

Bon Voyage Poem For Lovers

Latest News: Straight

Dear members and prospective owners Fuentelucha Parcel 18B. BBVA is starting to request documentation to each of us to the subrogation of the mortgage. Although the work is not yet complete and that there are approximately five months to sign the mortgage, they are asking for documentation and study.

The board of the association has scheduled a meeting this week with BBVA to address this issue. The conditions offered by the BBVA today are wasteful, because both the value of the property to be mortgaged (which has risen) and the interest rate does not reflect reality today. The mortgage of BBVA as it is signed in the purchase agreement, means that we would lose lots of money.

We
talks with various banks, BBVA not only to improve the economic conditions of all residents and can thus benefit everyone.

Since the partnership, we ask you for the moment, do nothing, to see what comes of these negotiations, which, as I say, benefit everyone. Of course, after each particular level, you can decide what fit. We just ask that, please do not do anything at the moment, not to lose power. The association was formed to defend the rights of their members and this is a vital issue that we will defend with all our weapons.

However, you will have to start preparing the documentation (payroll, contracts, etc..), Because it will be necessary sooner or later, so that after the procedures are faster.

any questions, you can be put in contact with the association and tell you everything.

For those owners who are not members and wish to join the association can do so by contacting us.

Sunday, January 24, 2010

Does Acer X3810 Have Blue Tooth

mortgage completion of the work

five weeks for completion of the work. Hopefully Factecsa Set Home and meet the deadline, as a delay in delivery of the work because of a bankruptcy is not considered "force majeure". We have caused enough damage already to continue causing us even more.

We've created a Facebook account. For those willing partners (partners only) may be added as a friend and hold a more fluid contact. You can find us on Facebook by searching through the email account parcela18b@hotmail.com .

Saturday, January 2, 2010

Images Of Herpes In The Arms

TORRE CUAJIMALPA


Meir Lobaton and Kristjan Donaldson have designed a residential building height of 36 levels to be built in Mexico City under the premise that can live in an apartment without paying for the price of land and with garden in the backyard. (Mar 23 June 2009)

Cuajimalpa Torre offers its residents a garden in each of the levels to break the dichotomy between land and construction and more importantly, provide an attractive and functional for family members.

The project is based on a level department for an area of \u200b\u200b400 m2 and 160 m2 garden, rotating the departments at an angle of 90 ° at higher levels the gardens were located on the roof of the lower level bedroom.

Rotating levels, the trees have enough room to grow and achieve a balance in the walls resulting in a structural mix and nature. This prevents an item, structure or nature that predominates on the facades. The interior spaces are organized to benefit the gardens.

Cuajimalpa Torre Torre Cuajimalpa, green tower in Mexico City [Meir Lobaton and Kristjan Donaldson]. Click here or on the image to see album.

Because the status of seismic instability that characterizes the city of Mexico, a deep system of shear walls and beams Vierendeel stabilize the structure while accommodating the rotation of floor plans.



Supplementary Information.

* Project: Torre Cuajimalpa.
* Author: Meir Lobaton and Kristjan Donaldson.
* Contributor: Javier Sepulveda.
* Location: Mexico City, Mexico.
* Construction Area: 25.000 m2.
* Consultants: Engineers Jarque Garcia, SC., Buro Happold Consulting Engineers PC
* Draft: July 2008 - March 2009.
* Status: Proceeding with the government.
* Date of completion: 2011.

Friday, January 1, 2010

Why Do Men Like Satin Boxers

CONTEC, Una forma diferente de construir

January 6, 2010

Building walls with CONTEC

Friend Builder, has been thinking how would save on materials and labor, including those cumbersome carries, if instead of using common partition , concrete block or cement block had the opportunity to use a lightweight product (400 to 600 kg/m3), placing more cleaning, high resistance to compression (25 to 50 Kg/cm2), uniformity of appearance, ease of cutting without generating excessive waste, and besides all greater ease of isolation?

Well let me say that this product exists, called CONTEC and is prepared in an autoclave cellular concrete, quality controlled, easy to install, although like all different process, tools and equipment required other than those normally used in our works . Staff training is provided by the same manufacturer, or, if necessary, the manufacturer will put you in touch with the professionals, fully trained, which makes loans to many customers.
on
The apparent cost of this product, you can download fully offset the burdens of construction, making more light foundations and structures in general, as well as Contec block walls, precast slabs will have the same material. With the construction of block walls based CONTEC, construction prevents tie castle walls, as when concrete blocks, only require the placement of washers at intersections. In the case of walls of 6.0 m without the castle, leaving an inch apart, placing each connecting two courses a sheet folded in "V", which is then filled with a compressible and elastic sealant material.

The wall construction in walls of 15 cm and above, are built using a block "U" of CONTEC , shoring up the doorways and windows and making the armed and drained according to project, this system will be saving on network centering window. In case you need the project on the wall CONTEC also can do traditional enclosures.

pipe for placement of facilities, the slots should not exceed one third of the thickness of the block, if necessary, there must be a sufficient distance to accommodate the pipe, then swayed and cement mortar seep sand. For the accommodation of electrical boxes and boats, are made with resaques a tool called "arrow to socket," mounted on a drill, final adjustments are made with a small chisel.

In areas where there are high concentrations of efforts and the junctions between cellular concrete and any other material, mesh is placed finish, which helps to prevent future cracks in the finish.

To finish, it also has a trim line of the cellular concrete, which are easy to install. For the final place a fiberglass mesh supplied by CONTEC and apply the mortar with trowel in a layer of 2 mm, the final tuning can be done with a 2 mm layer of mortar and plain sponge. For thicknesses greater than 5 mm, we recommend the use of wire mesh. Not recommended for cement-sand mortar. You can also make textured finishes, marble grain mixing the mortar. In the case of use for textured finishes, party products must be compatible with the cellular concrete CONTEC be insulated from moisture and compressive strength is not more than 80 Kg/cm2. The finish should prevent the passage of rain and also be permeable to water vapor, allowing the walls to "breathe" and ensure the moisture loss CONTEC cellular concrete.

For the application of paint, the wall must be clean and patching, we recommend the use of vinyl acrylic paint, avoiding the use of oil paints, because they are breathable material. The bathroom and kitchen tiles are placed with mortars in the market.


For more information about these products and their costs, please CONTACT


CONSTRUCTION REAL ESTATE TOUR, SA DE CV
TEL: (01-55) 5751-2912 TEL / FAX: (01 -55) 5751 -1296 MEXICO, DF
E-MAIL: Garcia_salvador@prodigy.net.mx
Attn: MR. SALVADOR GARCIA VAZQUEZ