Matrices









B-1600 CONCEPT: DATE
SUPPLY UNIT AND INSTALLATION OF WOODEN DOORS
PLATE INCLUDES FRAME OCT. PZA 98 WOOD O-0100 280.45 0400 112.18 JOR PEON O-1000 carpenter 0400 233.71 584.26 JOR WHITE INTERMEDIATE COMMAND AND TOOL% 0130 44.96 345.88 390.85 SUM

MATERIAL UNIT PRICE PERFORMANCE No COST ELEMENT M-1300 FINISH DOOR agglomerated INTEGRAL LAMINATED PZA
550.00 550.00 1000 M-1250 Table 3 / 4 "x 8" x 8 'PT 6880 09.22 63.42 M-1400
PLATE INTERCOMINICACION "GEO" PZA 1000 115.50 115.50 M-1430 HINGE
LATONA 3x3 PZA
SUM 105.60 3000 35.20 834.52

MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) JGO 0400 52.25 20.90 20.90
OST
DIRECT SUM 1,246.27




B-1650 CONCEPT: DATE AND PLACE SUPPLY UNIT
.
ENTABLERADA OF WOODEN DOOR WITH PLATE INCLUDES WOOD FRAME OCT. PZA 98


LABOR UNIT PRICE PERFORMANCE No COST ELEMENT
O-0100 280.45 0750 210.33 JOR PEON
O-1000 carpenter 0750 438.20 584.26 JOR WHITE
INTERMEDIATE COMMAND AND TOOL% 0130 648.53 84.31 732.84 SUM


MATERIAL No COST ELEMENT UNIT PRICE PERFORMANCE M-1320 WHITE GATE ACCESS CARD CAL. PZA 1010.90 1010.90 28 1000 M-1250 TABLE 3 / 4 "x 8" x 8 'PT 6880 09.22 63.42 M-1420
DOOR ACCESS PLATE "YALE" SEG. MAX. 1000 616.00 616.00
PZA M-1430 HINGE LATONA PZA 3x3 4000 35.20 140.80 1,831.12
SUMA

MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) AGM 0750 52.25 39.19 39.19

SUM DIRECT COST 2,603.15




B-1610 CONCEPT: DATE
SUPPLY UNIT AND PLACEMENT OF TYPE
DOOR PLATE WITH BRAND MULTIPANEL "GEO" OCT. PZA 98

LABOR UNIT PRICE PERFORMANCE No COST ELEMENT
O-0100 280.45 0500 140.22 JOR PEON
O-1000 carpenter 0667 389.51 584.26 JOR WHITE
INTERMEDIATE COMMAND AND TOOL% 0130 529.73 68.87 598.60 SUM


No ELEMENT MATERIAL UNIT COST PRICE PERFORMANCE
M-1320 WHITE GATE ACCESS CARD CAL. PZA 1010.90 1010.90 28 1000 M-1422 DOOR ACCESS PLATE "GEO" TUBULAR PZA SUM 137.50 137.50 1,148.40 1000

MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC. ) AGM 0667 52.25 34.83 34.83

SUM 1,781.83 DIRECT COST

B-1600B


CONCEPT: DATE
SUPPLY UNIT AND PLACEMENT
DOOR FINISH BOARDS PZA
JUL 2007 ROLLING, INCLUDING SUPPLY AND PLACEMENT OF PLATE
, HINGES AND CASING
, TOOL, EQUIPMENT AND LABOR
. LABOR

No COST ELEMENT UNIT PRICE PERFORMANCE PEON
O-0100 280.45 0400 112.18 JOR-1000
OR WHITE carpenters 0.400 233.71 584.26 JOR
INTERMEDIATE COMMAND AND TOOL% 0130 345.88 44.96 390.85 SUM
No ELEMENT MATERIAL UNIT PERFORMANCE COST PRICE M-1300
agglomerated DOOR WITH INTEGRAL LAMINATED FINISH
PZA
550.00 550.00 1000 M-1250 Table 3 / 4 "x 8" x 8 'PT 10000 92.18 09.22 PLATE M-1400
INTERCOMINICACION "GEO" PZA 1000 115.50 115.50 M-1430 HINGE
LATONA 3x3 PZA 105.60 3000 35.20 863.28 SUM


MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET,
Goggles, gloves , ETC.) AGM 0400 52.25 20.90 20.90

SUM 1,275.03 DIRECT COST

B-1610B


CONCEPT: DATE
SUPPLY UNIT AND INSTALLATION OF MAIN GATE TYPE MULTIPANEL

POSITIONING EXISTING SHEET AND HINGES INCLUDES: OCT. PZA 98
DEBRIS, TOOL AND LABOR. LABOR

ITEM No UNIT PRICE COST PERFORMANCE
O-0100 280.45 0500 140.22 JOR PEON
O-1000 carpenter 0667 389.51 584.26 JOR WHITE
INTERMEDIATE COMMAND AND TOOL% 0130 529.73 68.87 598.60 SUM

No ELEMENT MATERIAL UNIT COST PRICE PERFORMANCE M-1320 DOOR ACCESS WHITE PLATE CAL. PZA 1000 28 1010.90 1010.90 1010.90
SUMA

MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET,
goggles, gloves, etc..) AGM 0667 52.25 34.83 34.83

SUM 1,644.33 DIRECT COST


B
-1600CH CONCEPT
DATE
UNIT SUPPLY AND PLACEMENT OF PLATE
INTERCOMUNICACON, MARK "GEO" OR SIMILAR
INCLUDES: DEBRIS, PLACEMENT, OCT. PZA 98
MATERIALS AND LABOR LABOR

No COST ELEMENT UNIT PRICE PERFORMANCE PEON
O-0100 0.125 35.06 280.45 JOR-1000
O carpenters WHITE 0125 73.03 584.26 JOR
INTERMEDIATE COMMAND AND TOOL 0130 5.14% 108.09
122.14 SUM
MATERIAL UNIT PRICE PERFORMANCE No COST ELEMENT INTERCOMINICACION PLATE M-1400 "GEO" PZA
SUM 115.50 115.50 115.50 1000

No ELEMENT UNIT EQUIPMENT PERFORMANCE COST PRICE
Q-3000 SAFETY EQUIPMENT (HELMET,
goggles, gloves, etc..) AGM 0125 52.25 6.53 6.53 SUM

DIRECT COST 244.17