Wednesday, January 7, 2009

Keeping Water Out Of Ears When Swimming

Matrices de Impermeabilización



B-1860 CONCEPT:
SUPPLY UNIT DATE AND IMPLEMENTATION OF WATERPROOFING IMPERTAPCRETO
,
ELASTIC, THERMAL, APPLIED TO TWO HANDS, APRIL 2007 M2
INCLUDES: MATERIAL, LABOR,
TOOL AND SAFETY EQUIPMENT. LABOR

No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 0.010 2.92 292.13 JOR
WATERPROOFED OFFICIAL O-0725 0.010 3.51 350.56 JOR
INTERMEDIATE COMMAND AND TOOL 0130 0.84% \u200b\u200b6.43 ADD $ 7.26


MATERIAL UNIT PRICE ITEM No COST PERFORMANCE WATERPROOFING
IMPERTAPCRETO M-3500,
FLEXIBLE, HEAT KG 25.30 31.63 1250 $ 31.63

SUMA
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET
goggles, gloves, etc..) JGO
0.03 52.25 0001 0.03 SUM 38.91

DIRECT COST B-1870G

CONCEPT:
SUPPLY UNIT DATE AND APPLICATION OF MARK

Cementitious IMPERMEACRETO WATERPROOFING, CONCRETE BASE GREY AND APRIL 2007 M2
COLOR, applied to two hands, including:
SUPPLIES. LABOR, TOOLS AND SAFETY EQUIPMENT
. 4.5 mm THICKNESS

LABOR UNIT PRICE PERFORMANCE ELEMENT No COST ASSISTANT
O-0425 0.010 2.92 292.13 JOR
WATERPROOFED OFFICIAL OR-0725 3.51 0.010 350.56 JOR
3 INTERMEDIATE COMMAND AND TOOL% 6.43 0.84 0.130 ADD $ 7.26


MATERIAL UNIT PRICE ITEM No COST PERFORMANCE WATERPROOFING
Cementitious M-3510, GREY CEMENT BASE
KG 24.31 4.86 0200 $ 4.86

SUMA
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET ,
goggles, gloves, etc..) AGM 25/02 0010
0.52 $ 0.52 SUM 12.65

DIRECT COST B-2000

CONCEPT: DATE
UNIT SUPPLY AND PLACEMENT OF
POLYSTYRENE FOAM BATH IN PAN, JANUARY 2002 m3 INCLUDES
WATERPROOFING. LABOR

ITEM No UNIT PRICE COST PERFORMANCE
O-0100 0.125 35.06 280.45 JOR PEON
INTERMEDIATE COMMAND AND TOOL 0130 4.56% 35.06 $ 39.61 ADD


MATERIAL UNIT PRICE PERFORMANCE No COST ELEMENT
M-4000 STYROFOAM 20 CM THICKNESS 1020 M2 187.00 190.74 B-1875 WATERPROOF
TERMOACRILICO,
2 HANDS WITH REINFORCING MESH, 3 YEAR TERM
1.0500 M2 44.62 46.86 ADD $ 237.60


MACHINERY UNIT PRICE PERFORMANCE ELEMENT not
SUM COST $ 0.00 COST DIRECT
277.21

B-
1875 CONCEPT:
WATERPROOFING UNIT DATE
SLABS BASED THERMAL ACRYLIC EMULSION
TWO HANDS. FIRST BASE ACRYLIC AND STRENGTHENING MZO 2004 M2
MESH POLYESTER FIBER. 3 YEAR TERM LABOR

No COST ELEMENT UNIT PRICE PERFORMANCE PEON
O-0100 0.025 01.07 280.45 JOR-0700 PAINTER
O 0025 10.52 420.67 JOR
3 INTERMEDIATE COMMAND AND TOOL% 17.53 02.28 0130 $ 19.81

SUM MATERIAL
No ITEM UNIT COST PRICE PERFORMANCE
ACRYLIC PRIMER M-3600 MARK LT BAF
0.27 0017 16.32 M-3610 THERMAL ACRYLIC WATERPROOFING
BAF (3 YEARS) LT 1000 21.88 21.88 M-3640
REINFORCEMENT FIBER MEMBRANE
POLYESTER M2 2.42 2.66 1100 $ 24.82

SUMA
MACHINERY UNIT PRICE PERFORMANCE ELEMENT not
SUM COST COST $ 0.00 BY 44.62



B-1880 CONCEPT: DATE UNIT
CAULKING CRACKS IN TILE BASED
Sikaflex 1-A INCLUDES SET OF CRACKS
JUN 2004 M2 DISK FOR CEMENT.

LABOR UNIT PRICE PERFORMANCE No COST ELEMENT
O-0100 280.45 0100 04.28 JOR PEON
O-0700 0.100 42.07 420.67 JOR PAINTER
O-0425 0.100 29.21 292.13 JOR ASSISTANT
3 INTERMEDIATE COMMAND AND TOOL% 0130 12.91 99.32 SUM
$ 112.24

No ELEMENT MATERIAL UNIT COST PRICE PERFORMANCE Sikaflex
M-3650 1-A 22.00 0017 ML $ 0.37 SUM 0.37


MACHINERY UNIT PRICE PERFORMANCE ELEMENT not
B-0125 COST TIME COST CUTTING CONCRETE FLOOR TIME
112.73 SUM 0067
7.52 $ 7.52 120.12

DIRECT COST B-1872

CONCEPT: DATE OF SLAB WATERPROOFING
UNIT BASED ASPHALT EMULSION
Festo
TWO HANDS. FIRST BASE ACRYLIC AND REINFORCING MESH
FIBER POLYESTER
MZO 2004 M2. DURATION 3 years 2

LABOR No COST ELEMENT UNIT PRICE PERFORMANCE PEON
O-0100 0.033 9.35 280.45 JOR-0700 PAINTER
O 0033 02.14 420.67 JOR
3 INTERMEDIATE COMMAND AND TOOL% 23.37 03.04 0130 $ 26.41

SUMA
MATERIAL UNIT PRICE ITEM No
M-COST PERFORMANCE WATERPROOFING 1696I IMPERFACIL
FEST, 2 YEARS LT
16.44 16.44 1000 16 962 M-1000 MESH FESTERFLEX M2 5.9 5.9 16 963 M-PAINT
imperf Festo
TERRACOTTA COLOR LT 59.81 11.96 0200 $ 33.50

SUMA
MACHINERY UNIT PRICE PERFORMANCE ELEMENT No Q-3000
COST SAFETY EQUIPMENT (CASCO,
goggles, gloves, etc..) AGM 0033 1.74 52.25 $ 1.74

SUM DIRECT COST 61.65

B-1870b
CONCEPT:
SUPPLY UNIT DATE AND APPLICATION OF MARK

Cementitious IMPERMEACRETO WATERPROOFING, CONCRETE BASE
WHITE AND COLOR, applied to two hands, including: APRIL 2007 M2
SUPPLIES. LABOR, TOOLS AND SAFETY EQUIPMENT
. 4.5 mm THICKNESS OF LABOR

No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 0.010 2.92 292.13 JOR
WATERPROOFED OFFICIAL O-0725 0.010 3.51 350.56 JOR
3 INTERMEDIATE COMMAND AND TOOL% 6.43 0130 $ 0.84 ADD
7.26

MATERIAL UNIT PRICE ITEM No COST PERFORMANCE WATERPROOFING
Cementitious M-3511, WHITE CEMENT BASE
KG 33.32 6.66 0200 $ 6.66

SUMA
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) JGO
SUM 52.25 0.52 0010 $ 0.52 1445 DIRECT COST


B-1870m
CONCEPT: DATE UNIT

SUPPLY AND APPLICATION OF MARK WATERPROOFING Cementitious
IMPERMEACRETO, MORTAR BASE OF APRIL 2007 M2
CEMENT AND COLOR, APPLIED TO TWO HANDS,
INCLUDES: SUPPLIES. WORKMANSHIP
TOOL AND SAFETY EQUIPMENT. 4.5 mm THICKNESS


LABOR UNIT PRICE PERFORMANCE ELEMENT No COST ASSISTANT
O-0425 0.010 2.92 292.13 JOR
WATERPROOFED OFFICIAL OR-0725 3.51 0.010 350.56 JOR
3 INTERMEDIATE COMMAND AND TOOL 0130 0.84% \u200b\u200b6.43 ADD $ 7.26


MATERIAL UNIT PRICE PERFORMANCE No COST ELEMENT
M-3512 Cementitious WATERPROOFING, CEMENT MORTAR BASE
0200 4.49 KG $ 0.90 0.90 SUM


MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) AGM 0010 52.25 0.52
SUM DIRECT COST $ 0.52 8.68

0 comments:

Post a Comment