B-1900 CONCEPT:
MANUFACTURING UNIT DATE OF BEAMS AND LOAD FACTORS WITH METAL
POLIN (MONTE) JANUARY 2002 Kg
LABOR UNIT PRICE PERFORMANCE No COST ELEMENT
O-0425 1.95 0.0067 292.13 JOR ASSISTANT
O-1600 0.007 03.12 467.41 JOR WELDER
3 INTERMEDIATE COMMAND AND TOOL% 0130 06.05 0.66 5.72 SUM
No ELEMENT MATERIAL UNIT COST PRICE PERFORMANCE
M-2700 CONSTRUCTION OF BEAMS WITH POLIN
(MONTE) Kg 1030 16.50 17.00
ELECTRIC WELDING M-2800 49.50 0.1000 4.95 60/13 Kg
MISCELLANEOUS MATERIAL
4.39% 0200 21.95 26.33 SUM
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT
Q-0600 TO 300 AMP WELDER MACHINE PART 49500.00 24.75 0.0005
Q-0650 POLISHER, FACE AND ACCESSORIES LOT
SUMA 4950.00 29.70 4.95 0001
DIRECT COST 61.76
B-1910 CONCEPT: DATE
MANUFACTURING UNIT TO CANCEL, WINDOWS AND DOORS WITH METALLIC ELEMENTS
BRAND JANUARY 2002 Kg
PROLAMSA or similar, including: SUPPLIES,
DEBRIS, LIFTS, LOANS, AND HAND TOOLS
LABOR WORK
ELEMENT No UNIT PRICE COST PERFORMANCE ASSISTANT
O-0425 0.008 2.34 292.13 JOR
O-1600 0.008 3.74 467.41 JOR WELDER
O-0400 0.020 8.41 420.67 JOR MASON
O-0100 0.020 5.61 280.45 JOR PEON
3 INTERMEDIATE COMMAND AND TOOL 0130 2.61 20.10% SUMA
22.71
MATERIAL UNIT PRICE PERFORMANCE ELEMENT not
M-2730 COST METALLIC PROFILES OR SIMILAR MARK PROLAMSA
, CAL. 1030 16.50 17.00 20 Kg
ELECTRIC WELDING M-2800 49.50 0.0667 3.30 60/13 Kg
MATERIAL MISCELLANEOUS% 0200 20.30 24.35 06.04 SUM
MACHINERY UNIT PRICE ITEM No COST PERFORMANCE MACHINE
Q-0600 UP TO 300 AMP WELDER PART 49500.00 24.75 0.0005
Q-0650 POLISHER, FACE AND ACCESSORIES LOT
SUMA 4950.00 4.95 0001 29.70 76.77
DIRECT COST