IU-0100 CONCEPT: DATE UNIT
SHORING, ASSEMBLY AND CASTING OF BASE FOR POLE LIGHTING
, January 2004 PZA CONCRETE f'c = / 200 Kg/cm2, INCLUDING ANCHOR 5 / 8 "
LABOR UNIT PRICE AMOUNT No COST ELEMENT 1246.84 349.12 0280 B-0910 SUPPLY AND INSTALLATION OF STEEL No. 3 (3 / 8 ") 0002 TON 36.64 17,872.57
61.08 218.16 0280 B-0250 sticks and uncentering FOUNDATION IN M2 125.42 112.87 0.90 B-0890 SUPPLY AND INSTALLATION OF STEEL
No. 2 (1 / 4 ") TON 25313.55 655.15 0004 95.43
SUMA
No ELEMENT MATERIAL UNIT COST AMOUNT PRICE M-1115
ANCHOR ROUND BAR 5 / 8" x 50 cm
THREADED
PZA 52.25 4.00 209.00 209.00
MACHINERY
SUM ITEM No COST QUANTITY UNIT PRICE AMOUNT 0.00
DIRECT COST 864.15
IU-0150 CONCEPT
DATE
DUCT UNIT TWO WAYS FOR ELECTRICAL LIGHTING SYSTEM WITH
January 2004 ML TUBE PVC CONDUIT 2 "and Formwork
with f'c = 150 kg/cm2, INCLUDING EXCAVATION AND FILL COMPACTED
LABOR
No COST ELEMENT UNIT PRICE AMOUNT
B-0180 MANUAL MATERIAL II EXCAVATION M3 99.61 30.13 0303 B-0290
HO CONCRETE f'c = 150 kg/cm2 TO STRUCTURES M3
1137.70 75.09 0066 B-0200 CAST AND CONCRETE VIBRATED M3 STRUCTURES IN
14.40 218.16 0066 B-0245 SHORING COMMON DUCT FOR ELECTRICAL FORMWORK 20.19 0.30 06.06 M2
B-0160 OR FILL IN STRAINS PLATEAUS WITH
TEPETATE, COMPACTED TO DANCER M3 SUM 224.32 166.05 0.18 40.38
No ELEMENT MATERIAL UNIT COST AMOUNT PRICE
M-2197 PVC CONDUIT 2 "17.41 2.00 34.83
ML-1220 M WOOD 2 / A SHORING FOR COMMON PT SUM 2.00 2.75 1.38 37.58
MACHINERY UNIT PRICE AMOUNT No COST ELEMENT
DIRECT COST SUM 203.63 0.00
I-1310 CONCEPT: DATE BASE UNIT
Tinaco
PARTITION WALLS WITH RED, 15 x 4 CASTLES 15 AND CONCRETE SLAB
10 cm, ARMED WITH STICKS MZO
OF LOT # 2004 3@0.20 m and f'c = 150 kg/cm2
LABOR UNIT PRICE AMOUNT No COST ELEMENT
B-0290 HO CONCRETE f'c = 150 kg/cm2 TO STRUCTURES M3
1137.70 291.48 0256 B-0850 formwork and slab and
uncentering RAMPS, M2 APPARENT 143.13 2.4400 349.24
B-0200 and vibrates CASTING CONCRETE STRUCTURES M3 55.89 218.16 0256 B-1100 PARTITION WALL ANNEALED 12/06/1924
COUPLED RED C / MORTAR M2 16 298.32 644.37 B-1300
LEVELLING MORTAR MIX M2 1:5 CEMENT SAND
4.32 141.08 609.46 SHORING
I-0079, ASSEMBLY AND CASTING OF CASTLE CONCRETODE
0.15x0.15 m
ARMING ARMEX 15x15-4 CAL. 8 And
f'c = 200 kg/cm2 ML
582.65 161.85 3.60 B-1310 NOZZLE MIXING CEMENT SAND MORTAR 1:5 ML
47.30 07.20 340.56 2,873.65
SUMA
No ELEMENT MATERIAL UNIT COST AMOUNT PRICE AMOUNT 0.00
MACHINERY UNIT PRICE AMOUNT ELEMENT not
SUM COST DIRECT COST 2,873.65 0.00