B-1500 CONCEPT: DATE LOCATION AND TEST UNIT
electrical output,
includes: Slot, tubing,
GUIDE WIRE GALVANIZED, CABLE LAYING
CAL 12/18 ,
FITTING ACCESSORIES AND COVER, LABOR,
TOOL AND SAFETY EQUIPMENT. April 2007 OUT LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE
O-0100 280.45 0435 121.93 JOR PEON
O-0800 654.38 0435 284.51 JOR ELECTRICIAN
3 INTERMEDIATE COMMAND AND TOOL% 406.44 52.84 0130 MAXIMUM PRICE
piece SUM 246.33 $ 459.28
MATERIAL UNIT PRICE PERFORMANCE ELEMENT not
MMAN13 COST ELECTRIC HOSE 13 mm ML 3000 3.76 1.25
MCAB112 COPPER CABLE SINGLE # 12 ML 8000 3.81 30.47
MAPAG MODUS DAMPER WITH METAL LID 1000 24.67 24.67 PZA
MCON CONTACT MODUS WITH METAL LID 0333 02.08 05.24 PZA MISCELLANEOUS MATERIAL
0050 459.28 22.96% $ 89.89
SUMA
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) AGM 0304 52.25 15.90 SUMA
DIRECT COST $ 15.90
565.07
B-1510
CONCEPT: DATE
WIRING UNIT FOR AIR CONDITIONING,
INCLUDES SUPPLIES, GROOVED. Tubing, JANUARY 2002
OUTPUT WIRING ACCESSORIES AND PLACEMENT OF LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 292.13 1000 292.13 JOR
O-0800 654.38 1000 654.38 JOR ELECTRICIAN
3 INTERMEDIATE COMMAND AND TOOL% 0130 123.05 946.51 SUM $ 1,069.55
MATERIAL UNIT PRICE PERFORMANCE ELEMENT not
MMAN13 COST ELECTRIC HOSE 13 mm 15 000 18.81 01.25 ML-2020 M
THW WIRE GAUGE # 10 ML 45 000 190.08 04.22
Marraco
AIR CONDITIONING STARTER PZA 1000 27.50 27.50
MCONAC
AIR CONDITIONING CONTACT PZA MATERIAL
35.20 1000 35.20 0200 54.32 271.59 MISCELLANEOUS% SUM $ 325.91
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET,
Goggles, gloves, ETC.) AGM 0700 52.25 36.58 $ 36.58
SUM 1,432.04 DIRECT COST
B-1520 CONCEPT: DATE UNIT SWITCH WIRING
INCLUDES SUPPLIES, GROOVED. Tubing, JANUARY 2002
OUTPUT WIRING ACCESSORIES AND PLACEMENT OF LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 0.333 97.38 292.13 JOR
O-0800 654.38 0333 218.13 JOR ELECTRICIAN
3 INTERMEDIATE COMMAND AND TOOL% 0130 41.02 315.50 ADD $ 356.52
MATERIAL UNIT PRICE ITEM No
MMAN13 COST PERFORMANCE HOSE 13 mm ML ELECTRICAL 5000 06.27 01.25
MCAB110 SINGLE COPPER CABLE # 10 10 000 60.50 06.05 ML
MINT230 2x30 SWITCH C / CARTRIDGES PZA MATERIAL
78.12 1000 78.12 0100 14.49 144.89 MISCELLANEOUS% SUM $ 159.38
MACHINERY UNIT PRICE ITEM No COST PERFORMANCE Q-3000
SAFETY EQUIPMENT (HELMET,
goggles, GLOVES, ETC.) AGM 19/12 0233
52.25 $ 12.19 ADD DIRECT COST 528.09
B-1530 CONCEPT: DATE
SUPPLY UNIT AND PLACEMENT CENTER
LOAD UP TO 20 PADS
HOOK (L MAX. 15 m),
INCLUDES SUPPLIES, HAIR IN PLACE AND CABLE
. PADS NOT INCLUDED. JANUARY 2002 PZA
LABOR UNIT PRICE PERFORMANCE ELEMENT No COST ASSISTANT
O-0425 292.13 2000 584.26 JOR-0800 OR ELECTRICIAN
JOR
3 1308.75 654.38 2000 INTERMEDIATE COMMAND AND TOOL% 1893.01 283.95 0150 $ 2176.97
SUM MATERIAL
No ITEM UNIT COST PRICE PERFORMANCE
MMAN19 ELECTRIC HOSE 19 mm 15 000 30.86 02.06 ML
MCAB110 COPPER SINGLE # 10 ML 45 000 272.23 06.05
MQO14 LOAD CENTER QO-20 L125 c / src. PZA 1000 1374.71 1374.71 1677.80
MATERIAL MISCELLANEOUS% 0100 167.78 $ 1,845.58
SUMA
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) JGO
SUM 41.80 52.25 0800 $ 41.80 DIRECT COST 4064.35
B-1540 CONCEPT: DATE UNIT Electrical fitting
MAY 2002 LABOR OUT
No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 0.053 15.38 292.13 JOR
O-0800 0.053 34.44 654.38 JOR ELECTRICIAN
3 INTERMEDIATE COMMAND AND TOOL 0150 7.47% 49.82 $ 57.29 ADD
No ELEMENT MATERIAL UNIT PERFORMANCE COST PRICE AMOUNT $ 0.00
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET,
goggles, gloves, etc..) JGO 1.93 52.25 0037 $ 1.93
SUM DIRECT COST 59.21
B -1501
CONCEPT: DATE
SUPPLY AND INSTALLATION UNIT DE SALIDA
PARA TV o TELEFONO INCLUYE:
RANURADOS. ENTUBADO Y COLOCACION MZO 2004 SALIDA
DE ACCESORIOS
MANO DE OBRA
No ELEMENTO UNIDAD PRECIO RENDIMIENTO COSTO
O-0100 PEON JOR 280.45 0.250 70.11
O-0800 ELECTRICISTA JOR 654.38 0.250 163.59
3 MANDO INTERMEDIO Y HERRAMIENTA % 233.71 0.130 30.38
SUMA $ 264.09
MATERIAL
No ELEMENTO UNIDAD PRECIO RENDIMIENTO COSTO
MMAN13 MANGUERA ELECTRICA DE 13 mm ML 1.25 3.000 3.76
MAPAG APAGADOR MODUS CON TAPA METALICA PZA 24.67 1.000 24.67
MATERIAL DIVERSOS % 28.44 0.100 2.84
SUMA $ 31.28
MAQUINARIA
No ELEMENTO UNIDAD PERFORMANCE COST PRICE
Q-3000 SAFETY EQUIPMENT (HELMET,
goggles, gloves, etc..) AGM 06/13 0250
52.25 $ 13.06 ADD DIRECT COST 308.43
B-1500T10
CONCEPT:
UNIT INSTALLATION DATE LINE ELECTRIC PVC
OF 13/25 mm, includes: Slot. FEB 2007 ML
PLACEMENT, DEBRIS, TOOL AND LABOR
.
LABOR UNIT PRICE PERFORMANCE No COST ELEMENT
O-0100 0.040 22.11 280.45 JOR PEON
O-0800 0.040 26.18 654.38 JOR ELECTRICIAN
3 INTERMEDIATE COMMAND AND TOOL 0130 4.86 37.39% $ 42.25
SUM
MATERIAL UNIT PRICE PERFORMANCE ELEMENT not
SUM COST $ 0.00
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) AGM 09/02 0040 52.25 ADD $ 2.09
DIRECT COST 44.34
B-1500T104
CONCEPT:
UNIT PLACEMENT DATE TYPE THW-LS CABLE CAL.
No 10 to 20, INCLUDING DIRECT BY FEB 2007 ML
LABOR AND MATERIALS REQUIRED
FREIGHT OF WORK, CARRY, WASTE,
LAYOUT, CUT, MAKE AND TEST GUIDED
, WIRED, HAIR, CONNECTING, SOLDER
, Pregnant, CLEANING AND REMOVAL OF SURPLUS
NOT WORK.
LABOR UNIT PRICE PERFORMANCE No COST ELEMENT
O-0100 0.013 3.51 280.45 JOR PEON
O-0800 654.38 0013 08.18 JOR ELECTRICIAN
3 INTERMEDIATE COMMAND AND TOOL 0130 1.52% 11.69 $ 13.20 ADD
MATERIAL UNIT PRICE ITEM No PERFORMANCE FEE AMOUNT $ 0.00
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) JGO
52.25 0.65 0013 $ 0.65 SUM 13.86
DIRECT COST
B- 1500T103
CONCEPT:
UNIT PLACEMENT DATE TYPE THW-LS CABLE CAL.
No 2 to 8, INCLUDING DIRECT BY FEB 2007 ML
LABOR AND MATERIALS REQUIRED
FREIGHT OF WORK, CARRY, WASTE,
LAYOUT, CUT, MAKE AND TEST GUIDED
, WIRED, HAIR, CONNECTING, SOLDER
, TAPE, CLEANING AND REMOVAL OF SURPLUS
NOT WORK. LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE
O-0100 0.017 4.67 280.45 JOR PEON
O-0800 0.017 10.91 654.38 JOR ELECTRICIAN
3 INTERMEDIATE COMMAND AND TOOL% 15.58 02.03 0130 $ 17.61
SUMA
MATERIAL UNIT PRICE ITEM No COST EFFICIENCY ADD $ 0.00
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET,
goggles, gloves, etc..) JGO 0.87 52.25 0017 $ 0.87
SUM DIRECT COST 18.48
B-1532 CONCEPT
DATE
UNIT SUPPLY AND PLACEMENT OF LOAD CENTER
HOOK UP TO 12 PADS INCLUDES FEB 2007 PZA
SUPPLY CABLES IN PLACE AND HAIR OF LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 292.13 JOR 4.00 1168.53
O-0800 4.00 2617.50 654.38 JOR ELECTRICIAN
3 CONTROL INTERMEDIATE AND TOOL% 3786.03 567.90 0150 $ 4,353.93
SUMA
MATERIAL UNIT PRICE PERFORMANCE ELEMENT not
MQO14 COST LOAD CENTER QO-20 L125 c / src. PZA 1374.71 1374.71 1.00% 1374.71 MISCELLANEOUS MATERIAL
0100 137.47 $ 1,512.19
SUMA
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) JGO
SUM 52.25 52.25 1000 $ 52.25 DIRECT COST 5,918.37
B-1500T01
CONCEPT: DATE
SUPPLY UNIT AND INSTALLATION OF TUBE WALL GALVANIZED CONDUIT
THICK
FEB 2007 ML 13 mm, INCLUDES: TOOL WORKS HAND
, CORTES, JUNK, DEBRIS
AND SAFETY EQUIPMENT. LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE
O-0100 0.017 4.67 280.45 JOR PEON
O-0800 0.017 10.91 654.38 JOR ELECTRICIAN
3 INTERMEDIATE COMMAND AND TOOL 0150 2.34% 15.58 $ 17.92 ADD
MATERIAL UNIT PRICE ITEM No COST EFFICIENCY FG
CONFGGR13 CONDUIT WALL THICK
of 13 mm x 3.00 m 1020 ML 134.20% 136.88
MISCELLANEOUS MATERIAL 0100 13.69 136.88 $ 150.57
SUMA
MACHINERY UNIT PRICE ITEM No COST PERFORMANCE Q-3000
SAFETY EQUIPMENT (HELMET,
goggles, gloves, etc..) JGO 0.87 52.25 0017 $ 0.87
SUM DIRECT COST 169.36
B-1500T02
CONCEPT: DATE
SUPPLY UNIT AND INSTALLATION OF PIPE GALVANIZED CONDUIT
THICK WALL
FEB 2007 ML 19 mm, INCLUDES: TOOL WORKS HAND
, CORTES, JUNK, DEBRIS
AND SAFETY EQUIPMENT. LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE
O-0100 0.020 5.61 280.45 JOR PEON
O-0800 0.020 09.13 654.38 JOR ELECTRICIAN
3 INTERMEDIATE COMMAND AND TOOL 0150 2.80% 18.70
ADD $ 21.50
MATERIAL UNIT PRICE PERFORMANCE No COST ELEMENT
CONFGGR19
WALL CONDUIT FG thickness of 19 mm x 3.00 m
ML 149.60 1020 152.59 0100 152.59 MATERIAL MISCELLANEOUS 15.26% SUM $ 167.85
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) AGM 05/01 0020 52.25 ADD $ 1.05
DIRECT COST 190.40
B-1500T03
CONCEPT: DATE
SUPPLY UNIT AND INSTALLATION OF PIPE CONDUIT
THICK WALL GALVANIZED FEB 2007 ML 25 mm
INCLUDES: TOOL
LABOR, COURTS, JUNK, DEBRIS
AND SAFETY EQUIPMENT. LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE
O-0100 0.025 01.07 280.45 JOR PEON
O-0800 0.025 16.36 654.38 JOR ELECTRICIAN
3 INTERMEDIATE COMMAND AND TOOL 0150 3.51% 23.37 $ 26.88 ADD
MATERIAL UNIT PRICE ITEM No COST EFFICIENCY FG
CONFGGR25 CONDUIT WALL THICK
of 25 mm x 3.00 m 1020 ML 165.00% 168.30
MISCELLANEOUS MATERIAL 0100 16.83 168.30 $ 185.13
SUMA
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET
GOGLES, GUANTES, ETC.) JGO 52.25 0.025 1.31
SUMA $ 1.31
COSTO DIRECTO 213.31
B-1533
CONCEPTO: FECHA UNIDAD
SUMINISTRO Y COLOCACION DE CENTRO DE CARGA
DE 2 a 8 PASTILLAS TERMOMAGNETICAS. FEB 2007 PZA
SUMINISTRO, COLOCADO Y PEINADO DE CABLES
MANO DE OBRA
No ELEMENTO UNIDAD PRECIO RENDIMIENTO COSTO
O-0425 AYUDANTE JOR 292.13 0.333 97.38
O-0800 ELECTRICISTA JOR 654.38 0.333 218.13
3 MANDO INTERMEDIO Y HERRAMIENTA % 315.50 0.150 47.33
SUMA $ 362.83
MATERIAL
No ELEMENTO UNIDAD PRECIO RENDIMIENTO COSTO
MQO14 CENTRO DE CARGA QO-20 L125 c / src. PZA 1374.71 1374.71 1.00% 1374.71 MISCELLANEOUS MATERIAL
0100 137.47 $ 1,512.19
SUMA
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) JGO
SUM 17.42 52.25 0333 $ 17.42 DIRECT COST 1,892.43
B-1539 CONCEPT: DATE UNIT FLUORESCENT LIGHT FITTING
ANY CAPACITY, INCLUDING
BALLAST PLACEMENT AND CABINET FEB 2007 PZA
LABOR UNIT PRICE ITEM No
O-COST PERFORMANCE ASSISTANT 0425 53.11 0182 292.13 JOR ELECTRICIAN
O-0800 654.38 0182 118.98 JOR
3 INTERMEDIATE COMMAND AND TOOL% 0130 22.37 172.09 $ 194.46
SUMA
MATERIAL UNIT PRICE PERFORMANCE ELEMENT not
SUM COST $ 0.00
MACHINERY UNIT PRICE ITEM No COST PERFORMANCE TEAM
Q-3000 SECURITY (HULL,
goggles, gloves, etc..) JGO
SUM 52.25 9.50 0182 $ 9.50 203.96
DIRECT COST B-1500T800
CONCEPT: DATE UNIT DEVELOPMENT AND PLACEMENT
LAND SYSTEM BASED ROD Copperweld
OF 5 / 8 "BIT PLACED 3"
A 3.00 m deep, filled with
CHEMICAL ENHANCER (GEM), INCLUDES
GROUND WIRE CONNECTION. DOES NOT INCLUDE EXCAVATION
FEB 2007 PZA
LABOR UNIT PRICE PERFORMANCE ELEMENT No COST ASSISTANT
O-0425 0.222 64.92 292.13 JOR
O-0800 654.38 0222 145.42 JOR ELECTRICIAN
O-0100 0.222 62.32 280.45 JOR PEON
3 INTERMEDIATE COMMAND AND TOOL% 0130 35.45 272.66 $ 308.10
SUMA
MATERIAL UNIT PRICE PERFORMANCE ELEMENT not
SUM COST $ 0.00
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET,
Goggles, gloves, ETC.) JGO
SUM 11.61 52.25 0222 $ 11.61 319.71
DIRECT COST B-1500T801
CONCEPT:
DATE PROCESSING UNIT AND INSTALLATION OF HORIZONTAL GROUND
SYSTEM BASED ON COPPER TAPE PLACED
DITCH 20 '
(6.10 m) long, covered with GEM ENHANCER
25-A,
INCLUDES CONDUCTOR GROUND CONNECTIONS. DOES NOT INCLUDE EXCAVATION
FEB 2007 PZA
LABOR UNIT PRICE PERFORMANCE ELEMENT No COST ASSISTANT
O-0425 0.250 73.03 292.13 JOR
O-0800 654.38 0250 163.59 JOR ELECTRICIAN
O-0100 0.250 70.11 280.45 JOR PEON
INTERMEDIATE COMMAND AND TOOL 3 306.74 0.130 39.88% $ 346.61
SUM MATERIAL
No COST ELEMENT PERFORMANCE UNIT PRICE AMOUNT $ 0.00
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET,
Goggles, gloves , ETC.) AGM 06/13 0250
52.25 $ 13.06 ADD DIRECT COST 359.68