BT-1910 CONCEPT: DATE
SUPPLY UNIT AND PLACEMENT Drywall
WALL COATED INCLUDES: JUL 2007 M2
PROFILES REQUIRED FOR PLACEMENT,
TOOL
SCAFFOLDING AND LABOR. LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 0.111 32.46 292.13 JOR
OFFICIAL O-1700 0.111 57.13 514.15 JOR TABLAROQUERO
3 INTERMEDIATE COMMAND AND TOOL% 0130 11.65 89.59 ADD $ 101.23
No ELEMENT MATERIAL UNIT PERFORMANCE COST PRICE
M-2350 WHITE PLATE drywall
M2 36.40 1100 40.04 M-2362 PERIMETER ANGLE CAL. ML 16 2562 11.80 4.61 M-2361
LOAD CHANNEL 1-1/2 "x305 # 22 ML 3843 8.13 31.25
M-2363
PERFACINTA (75 ml) 3660 1.1 0.28 ML-2364 M
REDIMIX, BOX OF 25 Kg 0.96 Kg 5.76 0167 M-2365
SCREW 1 "drywall PZA 0.01 0.07 0200 T-0010
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY SUM
71.50 7.94 0.1111 $ 93.02
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) JGO
52.25 5.81 0111 $ 5.81 SUM DIRECT COST 200.06
BT-1915 CONCEPT: DATE
UNIT SUPPLY AND PLACEMENT OF FIREWALL DOS CARAS drywall
INCLUDES PROFILES
REQUIRED FOR PLACEMENT,
TOOL JUL 2007 M2
SCAFFOLDING AND LABOR.
LABOR UNIT PRICE PERFORMANCE ELEMENT No COST ASSISTANT
O-0425 0.143 41.73 292.13 JOR
O-1700 JOR OFFICIAL TABLAROQUERO
73.45 514.15 0143 3 CONTROL INTERMEDIATE AND TOOL% 0130 14.97 115.18 $ 130.16
SUMA
MATERIAL ELEMENT UNIT No PERFORMANCE COST PRICE
M-2350 WHITE PLATE drywall
M2 36.40 2100 76.44 M-2362 PERIMETER ANGLE CAL. ML 16 5124 23.61 4.61 M-2361
LOAD CHANNEL 1-1/2 "x305 # 22 ML 7686 8.13 62.51 M-2363
PERFACINTA (75 ml) 7320 2.2 0.28 ML-2364 M
REDIMIX, BOX OF 25 Kg 1.92 Kg 5.76 0333 M-2365
SCREW 1 "drywall PZA 0.03 0.07 0400 T-0010
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY SUM
21.10 71.50 0.1429 $ 176.73
MACHINERY No COST ELEMENT UNIT PRICE PERFORMANCE Q-3000
SAFETY EQUIPMENT (HELMET,
goggles, gloves, etc..) JGO 7.46 52.25 0143 $ 7.46
SUM DIRECT COST 314.35
BT-1920 CONCEPT: DATE
SUPPLY UNIT WALL AND INSTALLATION OF A FACE DUROCK
INCLUDES PROFILES REQUIRED FOR PLACEMENT
,
TOOL, HAMMOCKS AND LABOR. JUL 2007 M2
LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 0.167 48.69 292.13 JOR
OFFICIAL O-1700 0.167 85.69 514.15 JOR TABLAROQUERO
3 INTERMEDIATE COMMAND AND TOOL% 0130 17.47 134.38 ADD $ 151.85
MATERIAL No COST ELEMENT UNIT PRICE PERFORMANCE
SHEET M-2300 1.22x2.44 m DUROCK OF M2 137.46 144.34 1050 23 020 POST
M-1068 9.20x3.05 01.28 29.90 ML
GUIDE CHANNEL M-2301 6.35x3.00 m 23.53 0350 ML M-2304 8.24 EXTERIOTAPE
DUROCK TAPE 4 "x 45 m 10 980 34.45 03.14 ML-2303 M
PASTA BASE COAT 0333 12.53 22.7 Kg 18.4 Kg
BOLT M-2305 1-1/4" DS (DUROCK) PZA 0.39 43 920 T-0010 16.91
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY SUM
11.92 71.50 0.1667 $ 249.92
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (helmet, goggles, gloves, ETC. ) JGO 8.71 52.25 0167 $ 8.71
SUM DIRECT COST 410.48
BT-1925 CONCEPT: DATE
SUPPLY UNIT AND INSTALLATION OF WALL DUROCK
DUPLEX INCLUDES: JUL 2007 M2
PROFILES REQUIRED FOR PLACEMENT,
TOOL, HAMMOCKS AND LABOR. LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE
O-0425 ASSISTANT 0250 73.03 292.13 JOR-1700
OR OFFICIAL TABLAROQUERO
JOR 3 128.54 514.15 0250 INTERMEDIATE COMMAND AND TOOL% 0130 26.20 201.57 ADD $ 227.78
MATERIAL UNIT PRICE PERFORMANCE ELEMENT not
COST SHEET M-2300 1.22x2.44 DUROCK OF 2100 137.46 288.67 m
M2 M-23 020 ML POST 9.20x3.05 01.28 59.66 2130
GUIDE CHANNEL M-2301 6.35x3.00 m 0700 16.47 23.53 ML-2304 M
EXTERIOTAPE DUROCK TAPE 4 "x 45 m 22 000 69.03 03.14 ML M-2303
PASTA BASE COAT 0666 22.7 Kg 8.34 Kg 12.53 M-2305
SCREW 1-1/4 "DS (DUROCK) PZA 33.88 0.39 88 000 T-0010
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY 71.50 0.2500 SUMA
17.88 $ 493.93
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) AGM 06/13 0250
52.25 $ 13.06 ADD DIRECT COST
734.76 BT-1930
CONCEPT: DATE
SUPPLY UNIT AND PLACEMENT OF drywall
deposit box INCLUDES: JUL 2007 PROFILES REQUIRED FOR PLACEMENT
ML, TOOL,
SCAFFOLDING AND LABOR.
TO 0.50 m wide and 3.0 m high
LABOR UNIT PRICE PERFORMANCE ELEMENT No COST ASSISTANT
O-0425 0.182 53.11 292.13 JOR
OFFICIAL O-1700 0.182 93.48 514.15 JOR TABLAROQUERO
3 INTERMEDIATE COMMAND AND TOOL 0130 6.19% 146.60 $ 165.65
SUMA
MATERIAL UNIT PRICE PERFORMANCE No COST ELEMENT
M-2350 WHITE PLATE drywall
M2 36.40 0683 24.84 M-2362 PERIMETER ANGLE CAL. 16 ML 2100 9.67 4.61 M-2361
LOAD CHANNEL 1-1/2 "x305 # 22 ML 1050 8.54 8.13 M-2363
PERFACINTA (75 ml) 2100 0.28 0.58 ML-2364 M
REDIMIX, BOX OF 25 Kg Kg 0105 5.76 0.60 M-2365
SCREW 1 "drywall PZA 0.53 0.07 8000 T-0010
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY SUM
13.00 71.50 0.1818 $ 57.77
MACHINERY
No PRICE PERFORMANCE UNIT COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) JGO 9.50 52.25 0182 $ 9.50
SUM DIRECT COST 232.92
BT-1926 CONCEPT:
UNIT DATE SUPPLY AND PLACEMENT OF FIREWALL DOS CARAS DUROCK
, semicircular,
of 0.0 to 3.0 m in height, including: JUL 2007 M2
PROFILES THE NECESSARY TOOL
SCAFFOLDING AND LABOR. LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 0.200 58.43 292.13 JOR
OFFICIAL O-1700 514.15 0200 102.83 JOR TABLAROQUERO
3 INTERMEDIATE COMMAND AND TOOL% 0130 161.26 20.96 182.22 SUM
MATERIAL UNIT PRICE PERFORMANCE ELEMENT not
COST SHEET M-2300 1.22x2.44 m DUROCK OF M2 137.46 288.67 2100 23 020 POST
M-2130 9.20x3.05 01.28 59.66 ML
M -2301 ML CHANNEL GUIDE 6.35x3.00 m 0700 16.47 23.53 M-2304
EXTERIOTAPE DUROCK TAPE 4 "x 45 m 22 000 69.03 03.14 ML-2303 M
PASTA BASE COAT 0666 12.53 22.7 Kg 8.34 Kg
M-2305 SCREW 1-1/4 "DS (DUROCK) PZA 33.88 0.39 88 000 T-0010
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY SUM
14.30 71.50 0.2000 $ 490.35
MACHINERY UNIT PRICE PERFORMANCE ELEMENT No Q-3000
COST SAFETY EQUIPMENT (HELMET,
goggles, gloves, etc..) AGM 0200 52.25 10.45 $ 10.45
SUM DIRECT COST 683.02
BT-1916 CONCEPT: DATE
SUPPLY UNIT AND INSTALLATION OF WALL
SEMICIRCULAR drywall, DOS CARAS,
of 0.0 to 3.0 m, INCLUDES:
PROFILES REQUIRED FOR PLACEMENT,
TOOLS, SCAFFOLDING AND LABOR JUL 2007 M2
LABOR UNIT PRICE PERFORMANCE No COST ELEMENT
O-0425 ASSISTANT 0182 53.11 292.13 JOR-1700
OR OFFICIAL TABLAROQUERO 0182 93.48 514.15 JOR
3 INTERMEDIATE COMMAND AND TOOL 0130 146.60% SUMA
19.06 $ 165.65
MATERIAL UNIT PRICE PERFORMANCE No COST ELEMENT
M-2350 WHITE PLATE drywall
M2 36.40 2100 76.44 M-2362 PERIMETER ANGLE CAL. ML 16 5124 23.61 4.61 M-2361
LOAD CHANNEL 1-1/2 "x305 # 22 ML 7686 8.13 62.51 M-2363
PERFACINTA (75 ml) 7320 2.2 0.28 ML-2364 M
REDIMIX, BOX OF 25 Kg Kg 0333 5.76 1.92 M-2365
SCREW 1 "drywall PZA 0.03 0.07 0400 T-0010
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY SUM
13.00 71.50 0.1818 $ 179.52
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT
Q-3000 SAFETY EQUIPMENT (HELMET
goggles, gloves, etc..) JGO
SUM 52.25 9.50 0182 $ 9.50 354.67
DIRECT COST B-1960
CONCEPT: DATE
UNIT SUPPLY AND PLACEMENT OF MODULAR
61x61CON CEILING SUSPENSION OF MAY 2008 M2
PAINTED ALUMINUM INCLUDES GALVANIZED WIRE HANGING
, SCAFFOLDING,
TOOL WASTE AND LABOR. LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE
O-0100 0.125 35.06 280.45 JOR PEON
OFFICIAL O-1700 0.125 64.27 514.15 JOR TABLAROQUERO
INTERMEDIATE COMMAND AND TOOL% 0130 12.91 99.32 112.24
SUM MATERIAL
No COST ELEMENT UNIT PRICE PERFORMANCE
M-4006 60x60 cm PLAFOND MODULAR SUSPENSION FOR ALUMINIUM
M2 97.05 98.99 1020 TE
M-4007 PAINTED ALUMINUM SUPPORT FOR
M2 0.60 m 1050 16.76 15.96 M-4008 TE
ALUMINUM HOLDER, OF 3.00 1050 105.86 100.82 m
M2 M-4009 PERIMETER ALUMINUM ANGLE,
OF M2 61.18 1050 3.00 64.24 m
ACCESSORIES (ANCHORS, SCREWS,
WIRE, ETC.)% 0100 28.58 285.85 $ 314.43
SUMA
MACHINERY No COST ELEMENT UNIT PRICE PERFORMANCE T-0010
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY
0.0156 0.1250 14.12 Q-3000 EQUIPMENT SECURITY (HULL,
goggles, gloves, etc..) JGO 6.53 0.125 52.25 $ 6.5469
SUM DIRECT COST 433.22
B-1950 CONCEPT: DATE
UNIT SUPPLY AND PLACEMENT OF PLATE POLYSTYRENE
1 " PLAFOND, FEB. 2004 M2
STUCK WITH WATER BASE 5000 Resistol
LABOR UNIT PRICE PERFORMANCE No COST ELEMENT
O-0100 0.040 22.11 280.45 JOR PEON
O-0700 0.040 16.83 420.67 JOR PAINTER
INTERMEDIATE COMMAND AND TOOL 0130 4.28% SUMA
3.65 $ 31.69
MATERIAL UNIT PRICE PERFORMANCE No COST ELEMENT
M-4005 FOAM PLATE POLYSTYRENE 1 "M2 33.00 1020 33.66 M-1440
SILL ALUMINIUM 3 / 16" x 1-1/2 "24/04 1050 ML 25.25 Resistol
M-1960 LT WATER BASE 5000 57.89 2.89 0050
ACCESSORIES (ANCHORS, SCREWS , ETC.)% 61.80 09.27 0150 $ 71.07
SUMA
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT T-0010
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY 14.12 0.0400 0.0016 0.0016 SUM
DIRECT COST
102.76 BT-1900 CONCEPT
DATE
SUPPLY UNIT AND PLACEMENT OF FALSE CEILING drywall
WHITE, JAN 2007 M2
INCLUDES ANCHORS FOR HANGING
GALVANIZED WIRE AND EQUIPMENT AND LABOR LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 0.100 29.21 292.13 JOR-1700
OR OFFICIAL TABLAROQUERO 0100 51.42 514.15 JOR
3 INTERMEDIATE COMMAND AND TOOL% 0130 10.48 80.63 SUMA
91.11
MATERIAL UNIT PRICE PERFORMANCE No COST ELEMENT
M-2350 WHITE PLATE drywall
M2 36.40 1100 40.04 M-2362 PERIMETER ANGLE CAL. ML 16 2562 11.80 4.61 M-2361
LOAD CHANNEL 1-1/2 "x305 # 22 ML 3843 8.13 31.25
M-2366 wire rod ANCHOR DOWEL 1 / 4" x5 cm PZA 12 000 29.70 2.48 M-2363
PERFACINTA (75 ml) 0.28 ML 3660 M-2364 1.1
REDIMIX, BOX OF 25 Kg 0.96 Kg 5.76 0167 M-2365
SCREW 1 "drywall PZA 0.01 0.07 0200 T-0010
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY SUM
15.07 71.50 0.1000 121.93
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
SAFETY EQUIPMENT (HELMET,
goggles, gloves, etc..) AGM 07/20 0100 72.00 7.20
SUM DIRECT COST 220.24
BT-1905 CONCEPT: DATE
UNIT SUPPLY AND INSTALLATION OF FALSE CEILING drywall
GREEN
INCLUDES ANCHORS FOR HANGING AND WIRE GALVANIZED
JAN 2007 M2, EQUIPMENT AND LABOR LABOR
No COST ELEMENT UNIT PRICE PERFORMANCE ASSISTANT
O-0425 0.083 24.34 292.13 JOR
OFFICIAL O-1700 0.083 42.85 514.15 JOR TABLAROQUERO
3 INTERMEDIATE COMMAND AND TOOL% 0130 67.19 8.73 75.93
SUM MATERIAL
No COST ELEMENT PERFORMANCE UNIT PRICE M-2355
drywall GREEN PLATE M3 43.97 48.37 1100 M-2362
PERIMETER ANGLE CAL. ML 16 2562 11.80 4.61 M-2361
LOAD CHANNEL 1-1/2 "x305 # 22 ML 3843 8.13 31.25
M-2366 wire rod ANCHOR DOWEL 1 / 4" x5 cm PZA 12 000 29.70 2.48 M-2363
PERFACINTA (75 ml) 3660 1.1 0.28 ML-2364 M
REDIMIX, BOX OF 25 5.76 Kg 0.96 Kg
0167 M-2365 SCREW 1 "drywall PZA 0.01 0.07 0200 T-0010
SCAFFOLDS SECURITY INCOME
from 1 to 9 DAYS DAY SUM
71.50 5.96 129.07 0.0833
MACHINERY UNIT PRICE PERFORMANCE No COST ELEMENT Q-3000
Safety Equipment (Helmet, Goggles
, GLOVES, ETC.) JGO
SUMA 1.50 72.00 0021 1.50 206.49
DIRECT COST